USD12.00 - USD12.00
- Standard:ASTM
- Standard2:ASTM A179-1990
- Grade Group:A53-A369
- Grade:A192
- Section Shape:Round
- Place of Origin:CN;ZHE
- Application:Boiler Pipe
- Technique:Cold Drawn
- Alloy Or Not:Non-alloy
- Tolerance:±10%
- Type:Seamless Steel Pipe
- Processing Service:Bending
- Processing Service:Welding
- Processing Service:Decoiling
- Processing Service:Punching
- Processing Service:Cutting
- Thickness:2.2 - 25.4 mm
- Outer Diameter(Round):12.7 - 177.8 mm
- Certification:ISO 9001 ISO14001 TS16949
- Surface Treatment:Oiled
- Special Pipe:Boiler tubes
- Product name:China Manufacturer Structural Steel Tube Round Sections
- Secondary Or Not:Non-secondary
- Keywords:Steel Tube Sections
- Standard:SA179/ SA179
- Material:SA179/ SA179
- End protector:Plain
- Length:3-22m
- Type:SMLS
- Shape:Round Shape
- MTC:EN10204.3.2B
TORICH China Manufacturer Structural Steel Tube Round Sections Seamless Low Carbon Steel Boiler Tube
seamless boiler steel tube

TORICH China Manufacturer Structural Steel Tube Round Sections Seamless Low Carbon Steel Boiler Tube
Applications:
for Boilers,Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Manufacture:Tubes are manufactured by seamless process and both hot finished and cold finished are applicable.
seamless boiler steel tube
seamless carbon steel boiler tube
Heat treatment:Hot finished tubes need not be heat treated.Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher
Seamless low carbon steel boiler tube
Steel grade SA192 Chemical Composition & Mechanical properties
Hardness
Seamless low carbon steel boiler tube


Detailed Images







QUALITY CONTROL
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.



Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample of Seamless low carbon steel boiler tube for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us


